Tracking time on a task
Open a task and find the Time panel.
- Estimate – type how long the task should take, such as
2h 30m,1.5h,90mor2d, then click away to save. Anyone who can edit the task can set it. - Start timer – starts the clock on this task. Choose Stop timer when you finish. You can only have one timer running, so starting one on another task stops the first and saves its time.
- Add time by hand – pick a Date, type a Duration such as
1h 30mand an optional Note, then choose Add time. Billable starts ticked or unticked depending on the project’s time settings, so check it before saving.
The panel shows how much has been tracked against the estimate, and turns red when the task goes over.
Changing or removing time
Next to each entry choose Edit to change its date, start time, duration, note or whether it is billable, or Delete to remove it. You can change your own time. Project admins can change anyone’s, and those changes are recorded in the project’s Activity log.
Time marked Locked can’t be changed until a project admin chooses Unlock. The task’s Time panel lists the 8 most recent entries; find older ones in your timesheet or on the project’s Time page.
If the new time overlaps something you have already logged, you are warned first. Choose Save anyway if it is right. Time you add by hand on a task is placed at 9:00 that day, so a second entry for the same day will usually show this warning. Choose Save anyway, or add the time from your timesheet, which places it after your other entries.
Your timesheet
To open your timesheet, select your name at the top right, then My timesheet. It shows your week across every project you track time on, in your own timezone. The week starts on Monday, or on Sunday if you chose that in your preferences. Use Previous week, This week and Next week to move around.
- Click a cell to add time for that day, or to edit what is there.
- Use the arrow keys to move between cells, Enter to open one and Esc to close it.
- Under Add a row, choose a Project, then search for a task by title or reference and pick it. For time that isn’t for one task, choose Add a row for the project.
- Copy last week’s rows brings over the same projects and tasks, without the hours.
- The bottom row shows each day’s total against your daily target, and the week’s total.
If you leave a timer running
A timer left running for 10 hours is stopped for you, and you get an email. Your timesheet then shows You left a timer running. Choose Fix the time to enter what you really worked, or Keep 10h if that was right.
The project’s Time page
Open your project and select Other tools → Time (under Plan & improve). Everyone sees their own time there. Project admins see everyone’s time and, once an hourly rate is set, what it’s worth.
If nothing has been logged yet, you’ll see No time logged yet, with Go to tasks and Add time in my timesheet.
- Choose the dates. Select This week, Last week, This month or Last month, or Custom to pick From and To dates. The page opens on this month.
- Narrow it down. Select Filter to show only billable or non-billable time, one label or one campaign. Project admins can also pick one person. Clear filters removes them.
- Totals. Choose By task or By week (and By person, By label or By campaign where they apply) to change how the table is grouped.
- Estimate vs actual appears once a task has an estimate. Select a task’s title to see only its time; Show all tasks goes back.
- Export for invoicing. At the bottom, select Export CSV to download the entries as a spreadsheet file. Project admins can tick Lock them once exported before exporting, so nobody can change that time afterwards. An admin can Unlock an entry later.
Time settings (project admins)
Select Time settings at the top of the Time page, make your changes, then select Save time settings.
- Billing: Hourly rate, Currency, Count new time as billable, and Different rates for some people. A rate only applies to time logged after you set it; time already logged keeps its old rate.
- Budget: choose A total for the whole project or Hours each month, enter Hours in the budget, and set Warn admins at (%) (80 and 100 unless you change it).
- Timers: Round timers to 5 or 15 minutes, and Hours in a working day, which turns an estimate like
2dinto hours.
Select Back to time to return.
Budgets
When a project has a budget, project admins see a Time budget card (Time budget this month for a monthly budget) on the project’s Overview and Time pages. It shows the hours used and what is left, and for a monthly budget whether you’re on track. Admins get one notice each time an alert level, such as 80% or 100%, is reached in that budget period.